Project 2 Check-in 4 (individual survey part)
- Due Mar 21 by 5p.m.
- Points 0
Individual Requirement
Every student must fill out a short check-in survey (by the usual check-in deadline: friday 5pm), which can be found here: https://ubc.ca1.qualtrics.com/jfe/form/SV_2bCiVZA9dWAoMjs Links to an external site.
1742601600
03/21/2025
05:00pm
Additional Comments:
Rubric

Please include a title
Title
You've already rated students with this rubric. Any major changes could affect their assessment results.
Criteria | Ratings | Pts |
---|---|---|
This criterion is linked to a Learning Outcome
Description of criterion
threshold:
5 pts
|
This area will be used by the assessor to leave comments related to this criterion.
|
pts
/
5 pts
--
|
This criterion is linked to a Learning Outcome
Description of criterion
threshold:
5 pts
|
This area will be used by the assessor to leave comments related to this criterion.
|
pts
/
5 pts
--
|
Total Points:
5
out of 5